Sign In | Join Free | My disqueenfrance.com
China Daoyunai Energy Saving Technology Limited logo
Daoyunai Energy Saving Technology Limited
Committed to underground pipeline CIPP and CCTV
Verified Supplier

4 Years

Home > Trenchless Technology Training >

Inversion CIPP Liner Trenchless Technology Training Repair From Damage Film To Protect

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Inversion CIPP Liner Trenchless Technology Training Repair From Damage Film To Protect

Brand Name : DAO

Place of Origin : Jiangsu, China

MOQ : 20 m

Price : Variable

Payment Terms : T/T

Supply Ability : 300 km per year

Delivery Time : 15 working days

Packaging Details : Normal

Material : Protection film

Diameter : DN450

Thickness : 4.5mm

Length : 125m

Weight : Variable

Life : 50 years

Contact Now

Special film to protect CIPP liner from damage during trenchless repair

It is suggested that there should be 10 persons for one team, including one for overall process control, one for main equipment operation, and two for the bottom manhole.

Everyone should be proficient in the assembly of light chains, binding, binding, and other processes. In addition, when dragging materials, there shall be one person at the bottom of the well, at least four at the beginning, and two at the end if there is a winch. If there is no winch, more manpower is required to pull materials.

From the completion of pretreatment to the completion of curing, the whole process can be controlled within about 6-8 hours if skilled.

The product range covers four series and more than 20 models in the underground pipeline trenchless repair industry:

1. UV curing and repair integrated system D919: LED lamp curing and high-voltage mercury lamp curing

2. UV cure liner: from diameter DN200 up to DN1800

3. Hot water cure liner: impregnated liner to invert by water gravity and cure by hot water

4. Pipeline inspection robots crawler D18 and D18s: CCTV video inspection of pipeline defects

5. Pipeline periscope D16S: quickly view the internal defects of the pipeline

Film function Protection
Application CIPP technology
Length Any length is possible

Inversion CIPP Liner Trenchless Technology Training Repair From Damage Film To Protect


Product Tags:

DAO CIPP Liner Trenchless Technology Trainings

      

CIPP Liner Trenchless Technologys Training DAO

      

DAO Inversion Cipp Liners Trenchless

      
China Inversion CIPP Liner Trenchless Technology Training Repair From Damage Film To Protect wholesale

Inversion CIPP Liner Trenchless Technology Training Repair From Damage Film To Protect Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Daoyunai Energy Saving Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0